View Single Post
  #3 (permalink)  
Old 04-15-2008, 03:40 PM
Ed_ Ed_ is offline
Apprentice
 
Join Date: Apr 2008
Location: Iowa
Posts: 123
Default Re: Hello from Ames, Iowa, US

Local code here for poured footings is 48" below grade. I had thought of doing post-hole footings at the corners of the slab. The builder I talked to seemed to think that the foam, with good drainage beneath it, would actually do a better job of preventing heave.

I guess the other question is the one that should come first: How serious a concern is frost heave? I have nightmare images of a cracked slab, with the cracks going right on up the oven, but maybe that's just an overactive imagination.

-Ed
Reply With Quote