View Single Post
  #6 (permalink)  
Old 04-06-2008, 09:09 PM
jbaker jbaker is offline
Serf
 
Join Date: Mar 2008
Location: NorthEast
Posts: 16
Default Re: Started digging, stopped digging. Water problems.

I've been going by the plans I downloaded off this site. Here's a cut and paste of the materials list for the Pompeii:

Material List 42" Oven
80" x 94" Foundation

(46) 80lb bags of Ready-Mix concrete
(8) 10' lengths of 1/2" rebar, (4) cut to 80";(4) cut to 94"
(4) 2"x6"x8' studs for framing, (2) cut to 83";(2) cut to 94"
(48) sq ft of wire mesh
(12) rebar stand-offs
(104) sq ft of 6 mil plastic sheeting
Handful of plastic zip-ties, or ball of tie wire
1/2 cu yd of gravel
(1) box 2 1/2" framing nails


etc.....

From this link to the Forno Bravo storefront:

Instruction Manuals & e-Books :: Forno Bravo Store

Look on page 58

And I just found this while going way back in the forums:

http://www.fornobravo.com/forum/f6/p...lans-2265.html (Pompeii PDF Plans vs. Website plans)

Now I see where your question lies.

Last edited by jbaker : 04-07-2008 at 01:00 AM.
Reply With Quote