Quote:
Originally Posted by gjbingham You could also pour the concrete above the layer of the board and set the flashing at mid-pour (but above the level of the ceramic board) then place drainage groves laterally, against the flashing wall, that lead to each side of the landing. That may even be a better idea and more cosmetic. |
Yeah! I like that idea.
Arevalo, thanks for posting the pics of your oven entry. They gave me some other ideas as well. I like how your took your tile under the arch a bit. That would be easy for me to do at this point.
Excellent ideas guys. Thanks!