Default Re: vent and transition progress

Yes RT I will have one 2' and one 1' section of pipe. I will proppably go about 3 or 4 inches up the pipe with my mortar and then a bit of vermiculite and then Type N mortar with small river rock facing it all.
Should I bother going up the length of the pipe a bit with the vermiculite or would that be a waste of time?....thanks wayne