  #121  
Old 09-24-2012, 12:47 PM
texman's Avatar
Master Builder
 
Join Date: Nov 2009
Location: Amarillo, Texas
Posts: 588
Post Re: Oven Build in SC

The protrusion depends on your build and vent design. Look at mine compared to Russell. Russell has the arch protruding so it can support the rear of the chimney as mine was short and didn't leave room for support and required more work on the vent. (wish i would have made the arch protrude more.) A larger protrusion will require more than a half brick (normal firebrick size) I believe Russell had some larger brick, but mine were standard. I just used a 1/2 brick.Are you planning a semi-circular arch like Giannis? Karangi dude, Sharkey, Amac, and DJ's are all semi-circle. Before i steer you wrong, let's make sure that is the design we are talking about.
Tracy
Attached Thumbnails
Oven Build in SC-070312a.jpg  
Attached Images
 
__________________
My Progress:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.

Last edited by texman; 09-24-2012 at 02:07 PM. Reason: clarify
Reply With Quote
  #122  
Old 09-24-2012, 01:35 PM
UtahBeehiver's Avatar
Il Pizzaiolo
 
Join Date: May 2012
Location: Salt Lake City, Utah
Posts: 1,938
Default Re: Oven Build in SC

Hey this is Russell,

My arch bricks were cut from full length (9") to about 7" long so the arch protruded out more. Here are some pics of the template I made and used for the arch bricks used in the taper arch. The final taper angles are fine tuned by the IT. Hopes this helps
Attached Thumbnails
Oven Build in SC-34a-inner-arch-6.18.12.jpg   Oven Build in SC-34b-inner-arch-6.18.12.jpg   Oven Build in SC-41a-course-5-7.4.12.jpg  
__________________
Russell

Experiences are the names I call my mistakes!

Link to my build -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


My Picassa Picture Log
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #123  
Old 09-24-2012, 02:09 PM
texman's Avatar
Master Builder
 
Join Date: Nov 2009
Location: Amarillo, Texas
Posts: 588
Default Re: Oven Build in SC

Thanks Russell. That is exactly what i was trying to show and say. I should have use 3/4 brick but i guess i was sick that day that we covered that in class.
__________________
My Progress:

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #124  
Old 09-24-2012, 03:32 PM
Amac's Avatar
Journeyman
 
Join Date: Nov 2011
Location: Ireland
Posts: 358
Default Re: Oven Build in SC

Quote:
I should have use 3/4 brick
You can get 2 arch bricks bigger (slightly) than 1/2 size bricks from 1 brick using the method illustrated in the pic. The "protrusion" size in this case is limited to about 1.5 " - the top right and bottom left horizontal parts. Another trick I didn't think of until I had all the inner arch bricks cut.
I did depart from the script a bit on the inner arch to allow me to cut all the arch bricks identically. It did save me figuring out complex differences between left and right sides of the arch but at the expense of a dome slightly taller than a true hemisphere.
Good luck with the arch - any of the builds mentioned who pioneered this approach are worth studying.
I have a week or so now away from internet, so looking forward to huge progress when I get back - on all the ongoing builds
Attached Thumbnails
Oven Build in SC-28380d1329342469-39-stargate-pompeii-photo0293.jpg  
__________________
Amac

To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #125  
Old 09-25-2012, 04:32 AM
Apprentice
 
Join Date: Apr 2012
Location: South Carolina
Posts: 105
Default Re: Oven Build in SC

Thanks All!!
You guys are awesome! I hadn't put to much thought into the archway other than knowing I was going with a semi-circular pattern and with all the information just displayed on the subject I feel overwhelmed with the knowledge and experience from all of you. Thanks for everything. This puts me way ahead of the game instead of sitting there staring in bewilderment, wondering what I was going to do next.
My intention will be to have something similar to Russell's design where the protrusion from the dome will support the rear of the chimney/vent. I'm halfway finished setting the floor and should finish it tonight. Then to the first course that is level with the floor. From there the second course and I believe from what I've been reading and viewing that it's best to build up the inner archway. And I understand the IT will dictate the final taper angles for the arch.
After reading all these posts and viewing of the pics, the build process is starting to appear ALOT clearer and would not have been as fun without all that have helped and enjoy helping others. This is an amazing forum and you all are a rare breed!!!!! Sorry for the rambling, just happy to be apart of this!! Canít wait to get at it after work!!
Reply With Quote
  #126  
Old 09-26-2012, 04:05 AM
Apprentice
 
Join Date: Apr 2012
Location: South Carolina
Posts: 105
Default Re: Oven Build in SC

Note to one's self: Screen sand before use!! Found lots of little pebbles in my sand which made laying the floor bricks a little difficult. But after laying a couple bricks and not being able to level them I started peaking underneath to find the little pebbles. Not a big issue, just a PITA. Anyway I got about 3/4th of the floor laid before it was to dark and hope to get it done by tomorrow night. Getting midway to the center I found out my IFB layer was not as level as I once thought and had to use a little more sand/fireclay mixture then I expected to keep the floor level and even. I'm tamping them down pretty well so I don't believe this will be an issue.
Anyone have any thoughts about the amount of sand/fireclay underneath the dome floor? If this would be a concern I'd rather tackle it now then when I'm farther along. Well, off to buy a screen for the sand!!
Attached Thumbnails
Oven Build in SC-sdc11736-optimized.jpg   Oven Build in SC-sdc11737-optimized.jpg  
Reply With Quote
  #127  
Old 09-26-2012, 06:51 AM
UtahBeehiver's Avatar
Il Pizzaiolo
 
Join Date: May 2012
Location: Salt Lake City, Utah
Posts: 1,938
Default Re: Oven Build in SC

Videt,

Not sure how much sand you bought, but is you are using homebrew for your dome mortar, consider quartz sand, much finer and at least in UT available at big box stores like HD or Lowes, runs about $9 per 100 lb bag (the one on the right in the pic), i went though 2 bags on my build.
Attached Thumbnails
Oven Build in SC-30-fireclay-sand-bed-5.30.12.jpg  
__________________
Russell

Experiences are the names I call my mistakes!

Link to my build -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


My Picassa Picture Log
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
  #128  
Old 09-26-2012, 07:55 AM
Apprentice
 
Join Date: Apr 2012
Location: South Carolina
Posts: 105
Default Re: Oven Build in SC

Thanks Russ, I'm on the hunt now for it. When shopping for supplies originally, I was looking for something that displayed the grit but could not find anything. Maybe I was looking for the wrong thing. I try looking for the quartz sand. Thanks again
Reply With Quote
  #129  
Old 10-03-2012, 06:56 AM
Apprentice
 
Join Date: Apr 2012
Location: South Carolina
Posts: 105
Default Re: Oven Build in SC

Well after about five days of rain I finally finished the oven floor!! And got it outlined with the cardboard spacer. My cardboard I have is approx. 1/8" thick, is that what everybody uses for the thermal expansion of the floor or do I need to double it or get something thicker?? Also does the cardboard need to be a spacer around the entrance arch/landing also? Wasn't sure if there would be that much thermal expansion in that area that required it. Anybody have any thoughts on this?
Also even though I have the entrance way cut I am still contemplating a thermal break in the entrance floor. I have a piece of SS tube but I think the one I have at 1/4"(actually 0.230") wall thickness would probably still conduct heat due to this. I'm looking for any opinions on whether to leave it as is or put the break in. HELP!!
I couldn't resist testing the floor with a peel I have in the house, and I'm happy to say it glided quite nicely. It caught a few edges but nothing a few taps of the mallet didn't fix. This peel is aluminum and has a particularly narrow edge so all in all I was happy the way it worked. A wooden one should work beautifully!
I've also cut the first course of bricks for the OD of the floor (Am I right at guessing this is considered the first course?) And I should be getting them in place this week.
My template with the IT tool is also complete; It was a solid piece so I sliced it up for easy removal when the dome is complete.
As I read on someone's post previously- "It's time to go vertical!!".
Attached Thumbnails
Oven Build in SC-sdc11741-optimized.jpg   Oven Build in SC-sdc11742-optimized.jpg   Oven Build in SC-sdc11746-optimized.jpg   Oven Build in SC-sdc11747-optimized.jpg  

Last edited by videts38; 10-03-2012 at 07:12 AM.
Reply With Quote
  #130  
Old 10-03-2012, 07:23 AM
UtahBeehiver's Avatar
Il Pizzaiolo
 
Join Date: May 2012
Location: Salt Lake City, Utah
Posts: 1,938
Default Re: Oven Build in SC

Videts,

Looking good, I used one layer of corrugated cardboard around the perimeter between the dome and floor which was roughly and 1/8" but the space in reality ended up being 3/16" to 1/4" all said and done. Nothing on my end by the arch/landing. Just were the first course (sailor by my terms but I know this is a topic of wide discussion on what it is called). One thing I did do as I started up the dome was to mask off the gap with cardboard with some good old duct tape, This kept 99% of the mortar from getting into the gap, even though I had carboard there. Just an extra precaution and cheap. The fun begins, take you time. Watch out for vertical joints lining up, and a tip Tscar gave me early in my build. Adjust the brick widths to avoid "potato chip" narrow tie-in bricks. Last part of my rambling. I focus on place my best bricks, vertical staggers, etc where it could be seen by looking through your entry arch. most of my make-ups were closer to the tie-ins near the arch.
__________________
Russell

Experiences are the names I call my mistakes!

Link to my build -
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.


My Picassa Picture Log
To view links or images in signatures your post count must be 0 or greater. You currently have 0 posts.
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oven Curing james Firing Your Oven 335 07-15-2014 07:12 PM
Preparing for steel oven build. scarnucci Other Oven Types 31 07-06-2014 11:39 AM
Why Italian Wood-Fired Ovens are Round james Newbie Forum 50 04-01-2014 09:14 PM
New 40" oven build in Central MN goodnerbaker Introductions 4 09-08-2010 05:28 AM
All things being equal Lester Newbie Forum 13 12-21-2009 01:26 AM


All times are GMT -7. The time now is 07:47 PM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
© 2006/10 Forno Bravo, LLC