#11  
Old 03-03-2012, 03:40 AM
Laborer
 
Join Date: Sep 2009
Location: brisbane
Posts: 89
Default Re: The build goes on.

Well between showers I got the fire going again all day today. Nice and slow. Tonight I cranked it up a bit and all was well so some more and then the roof went white. Hot enough to cook a tray of vegies.
I have a small crack but no smoke comeing from it so I thinks it's ok. I will cover the crack in the morning by forcing in some ryebond, then weather permitting the ceramic blank goes on and a coat of render.
The the tile , paving sink etc. Top coat of render then some more slow fires, then PIZZA !
NO MORE RAIN !
Rob
Reply With Quote
  #12  
Old 03-03-2012, 04:44 AM
cobblerdave's Avatar
Il Pizzaiolo
 
Join Date: Jan 2010
Location: brisbane australia
Posts: 2,266
Default Re: The build goes on.

Gudday Rob
I leave in the east.....manly west....talk about coastal showers.. its bucketed down today. My oven is about as soaked as it could get....I was building Mod 2 door so last few weeks rains were blown in the oven so with todays 20mm its a No Can Use..... till this wheather changes.
One good thing is the woods piling up....I've run out of my usual stowage spaces and started to pile the excess along the chook pen.Come winter I'll have heaps and you can't get a better time in Brisbane to enjoy your oven than a winters day.

Regards Dave
Reply With Quote
  #13  
Old 03-08-2012, 01:20 AM
Laborer
 
Join Date: Sep 2009
Location: brisbane
Posts: 89
Default Re: The build goes on.

HI
I got 2 layers of 50mm blanket on, wire and a coat of render last weekend. It hasnot rained for a few days and all looks dry, so I made a small fire. Keep it going for 2 hours. Render still cool. So i made the fire bigger, got the roof just going white and the render is still cool. I am so impressed with the ceramic blanket. No heat gets out. I plan on trying pizza soon !

Istill need to tile bench tops and work out how I am going to dress up the front of the arch before getting a top coat of render on ,,,,,,,?
But so far no cracks in the render !
This thing might just work well after all !
Rob
Reply With Quote
  #14  
Old 03-08-2012, 01:46 AM
david s's Avatar
Il Pizzaiolo
 
Join Date: Mar 2007
Location: Townsville, Nth Queensland,Australia
Posts: 4,721
Default Re: The build goes on.

Q. Where did Noah keep his bees?
A. in the Ark hives (archives)
Reply With Quote
  #15  
Old 03-09-2012, 02:26 AM
Laborer
 
Join Date: Sep 2009
Location: brisbane
Posts: 89
Default Re: The build goes on.

Well the oven and outdoor kitchen is a long way from finished but the urge to cook over came me to night.
So I give you the first pizza from the oven. !!!!!!!!!!!!!!!!!!!!!!!!!!!!!
We are on a low carb, health kick so pizza is off the list but it's spelt flour so not as bad (just keep telling myself that).
Came out well I think and there is no leftovers from the other 6 pizzas.
Happy man, wife and family. Just need to get it finished too, so it's fit to entertain.
Attached Thumbnails
The build goes on.-2012-03-09-17.51.21-1280x960-.jpg  
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Oven Build In Central Alabama MetalHead Pompeii Oven Construction 80 08-06-2012 06:04 PM
Pensacola Build rodeair Pompeii Oven Construction 58 03-18-2012 08:52 PM
Wanting to build a wood fire oven the best way we can Wheels1974 Getting Started 9 05-19-2010 07:53 AM
Near completion, Pompeii build Jed Brick Oven Photos 5 05-28-2008 09:48 PM
Considering build of Pompeii oven jet Pompeii Oven Construction 21 05-10-2008 12:14 AM


All times are GMT -7. The time now is 08:59 AM.

Powered by vBulletin® Copyright ©2000 - 2014, Jelsoft Enterprises Ltd.
Search Engine Friendly URLs by vBSEO 3.6.0
2006/10 Forno Bravo, LLC