web analytics
Partially fill joint between dome fire bricks with steel wool before refractory - Forno Bravo Forum: The Wood-Fired Oven Community

Announcement

Collapse
1 of 2 < >

Photo Galleries are back! Instructions below.

Dear forum users,
Thank you for your patience with the Photo galleries. We've got your galleries online!
We have finished writing a custom script to migrate the PhotoPlog to vBulletin5’s albums.

Unfortunately V-Bulletin killed the "Photoplogs" in their software upgrade which was unforeseen and we're the first development group to have written a script for getting the galleries back... that said, it took some time to reverse engineer the code and get the albums to move over seamlessly!

Forum users will be able to access their “PhotoPlog” images through their user profile page by clicking on the “Media” tab.
They will also be able to browse other albums by going to the albums page. (On the forum site, there is a link in the black bar beside “Forums” to the albums.)

In order for users to create an album please follow the steps below.
1) Go to user profile page and click “Media”
2) Click Add Photos
3) Enter Photo Gallery Title in the first field
4) Click Upload or Select from Photo Album to add photos
5) Click Post
6) Once posted, the album will be created as a “Topic” on the albums page for the public to see. The topic title will be the “Photo Gallery Title” they created before uploading their photos.


To create this migration path we used vBulletin5’s default album structure. Unfortunately, it won’t work like the “PhotoPlog” but is an album/gallery component on the forum now.
2 of 2 < >

Dome Installation Video - Casa / Premio / Modena

Hello,

For many of you who bought a modular oven, you may have asked how we put the domes together when we build them. For those of you considering one of our ovens, we shot a video to make your install easier.

Check it out on our You Tube Channel.

https://www.youtube.com/watch?v=-7q7...jSniYogfUra06Q

If the link doesn't work, simply go to You Tube and type Forno Bravo Channel. The video title is How to Set your Forno Bravo Oven Dome Pieces.

Thanks for participating in our Forum. We will have more video content available soon.
See more
See less

Partially fill joint between dome fire bricks with steel wool before refractory

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • Partially fill joint between dome fire bricks with steel wool before refractory

    Doing a little maintenance on my 5 year old WFO (built from Alan Scott's book). One of the joints between dome fire bricks has lost its refractory mortar (Heat Stop).

    I tried to fill it with refractory mortar, but it was too deep, and the
    mortar fell out.

    I think if I partially filled the joint with something like steel wool(or some
    other recommended material) it would form a base that I could finish with Heat Stop.

    Anyone have any experience with this problem or any ideas that might help withthe repair.

    Thanks in advance.

  • #2
    Re: Partially fill joint between dome fire bricks with steel wool before refractory

    The deeper the better. Mix some heatstop and put it in a heavy duty ziplock bag. Cut one corner out so that it is about the size of the crack and squeeze it in. You may have to make the mix a tad wetter than normal.

    Comment


    • #3
      Re: Partially fill joint between dome fire bricks with steel wool before refractory

      Filling cracks is usually not particularly successful, but you can improve the success rate with this method.
      1. Take some of your Heatstop and sieve out the aggregate.

      2. Wet the area to be filled and leave for 10 mins so it is damp not wet.

      3. Mix some water with the sieved heatstop to form a thin slurry and paint this into the area to be filled. Then wait 10 mins again to allow the stuff to penetrate into the cracked surfaces.

      4. Mix up some unsieved Heatstop to a peanut butter consistency and apply.

      5. Leave for a few days before refiring.

      This method creates a better bond with the surfaces to be filled. Calcium aluminate cements do not require the extended curing times like Portland cement. 24 hrs and it's done, but you do need to then wait until it's properly dry.
      Last edited by david s; 05-08-2013, 01:20 PM.
      Kindled with zeal and fired with passion.

      Comment


      • #4
        Re: Partially fill joint between dome fire bricks with steel wool before refractory

        Thanks for your replies. I will incorporate both methods and give it a try. The joint in question is a mortar joint between two fire bricks in the dome.

        thanks again