web analytics
Finally Started - Forno Bravo Forum: The Wood-Fired Oven Community

Announcement

Collapse

Photo Galleries are back! Instructions below.

Dear forum users,
Thank you for your patience with the Photo galleries. We've got your galleries online!
We have finished writing a custom script to migrate the PhotoPlog to vBulletin5’s albums.

Unfortunately V-Bulletin killed the "Photoplogs" in their software upgrade which was unforeseen and we're the first development group to have written a script for getting the galleries back... that said, it took some time to reverse engineer the code and get the albums to move over seamlessly!

Forum users will be able to access their “PhotoPlog” images through their user profile page by clicking on the “Media” tab.
They will also be able to browse other albums by going to the albums page. (On the forum site, there is a link in the black bar beside “Forums” to the albums.)

In order for users to create an album please follow the steps below.
1) Go to user profile page and click “Media”
2) Click Add Photos
3) Enter Photo Gallery Title in the first field
4) Click Upload or Select from Photo Album to add photos
5) Click Post
6) Once posted, the album will be created as a “Topic” on the albums page for the public to see. The topic title will be the “Photo Gallery Title” they created before uploading their photos.


To create this migration path we used vBulletin5’s default album structure. Unfortunately, it won’t work like the “PhotoPlog” but is an album/gallery component on the forum now.
See more
See less

Finally Started

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • Finally Started

    I got the foundation poured today. I had 4 hours to before I had to make a mad dash and cover the pad with a tarp. The rain finally stopped and everything is ok. I hired a ready mix truck and got the concrete for only $130. Next week I will start the block stand. I wish I had more time to work on the oven but business takes me all over the place. Last week I was able to eat at some of my favorite pizza places in NYC.

  • #2
    Good idea to get the delivery truck. If any other oven builders have a site that is pretty far from the driveway or street, you can pay a pump company to get the concrete where you want. My memory is that the pump guys aren't that expensive.

    Ryan, why don't you add your favorite NYC spots to the restaurants section of the forum. I would like to see those.
    James
    Pizza Ovens
    Outdoor Fireplaces

    Comment


    • #3
      concrete pumping

      Most of the outfits in my area that do this are set up to pump larger volumes than the yard or so of concrete needed for the foundation. I found that for pumping you have to arrange a separate truck for concrete (with 7-8 yard capacity) and the pumping company. The concrete trucks charge extra for a short load.

      Ryan's solution of using Ready Mix is what I did as well: find a friend with a 1/4 ton pickup, go the the Ready Mix place and hook up a mixer on a trailer that is preloaded with 1 yard of concrete, tow to your site and dump into wheelbarrows and pour into the form. This is very inexpensive, probably cheaper than bags. I paid $180 for 1 1/2 yards. I incurred extra costs due to taking two loads and had the mixer for about four hours - the concrete itself was about $90. Huge time saver over bagged concrete.

      Ryan, have fun with the project! I bet most of users of this forum did their work when they could find a free weekend here and there as you plan.

      Comment


      • #4
        captain

        Hello Ryan, I am ready to startalso my foundation has already been done in the spring idid my patio and allowed for the oven tomarrow I am ordering the material for the stand and the oven floor,will try to start this on friday,good luck to you. Hey Isee you travel to ny to eat your favorite pizza have you ever been to Lombardies.
        Iwill post my progress on monday.

        Comment


        • #5
          Pizza

          Glad to hear you got started. I have 6 inches of snow on where I was working so I will have to wait at least 2 weeks until I can start again. That is Colorado for you! I have been to Lombardi's. I have also like Famous Joe's, John's, and Fransicas on the Upper West Side. Good luck and be sure to send photos. I will attach some photos here this week.

          Comment


          • #6
            captain

            I may be on hold as well for the winter I got the oven floor done and the first 2 rings dry stacked I dont want to mix morta and have a problem with it freezing, so I will do some inside worke for the winter, I will keep you posted.