web analytics
Cypress Build - Forno Bravo Forum: The Wood-Fired Oven Community

Announcement

Collapse

Photo Galleries are back! Instructions below.

Dear forum users,
Thank you for your patience with the Photo galleries. We've got your galleries online!
We have finished writing a custom script to migrate the PhotoPlog to vBulletin5’s albums.

Unfortunately V-Bulletin killed the "Photoplogs" in their software upgrade which was unforeseen and we're the first development group to have written a script for getting the galleries back... that said, it took some time to reverse engineer the code and get the albums to move over seamlessly!

Forum users will be able to access their “PhotoPlog” images through their user profile page by clicking on the “Media” tab.
They will also be able to browse other albums by going to the albums page. (On the forum site, there is a link in the black bar beside “Forums” to the albums.)

In order for users to create an album please follow the steps below.
1) Go to user profile page and click “Media”
2) Click Add Photos
3) Enter Photo Gallery Title in the first field
4) Click Upload or Select from Photo Album to add photos
5) Click Post
6) Once posted, the album will be created as a “Topic” on the albums page for the public to see. The topic title will be the “Photo Gallery Title” they created before uploading their photos.


To create this migration path we used vBulletin5’s default album structure. Unfortunately, it won’t work like the “PhotoPlog” but is an album/gallery component on the forum now.
See more
See less

Cypress Build

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • Cypress Build

    As I had promised sorry had to take with my phone. This is what it looks like now. I am going to pick up the concrete today and will post pic of label later.





  • #2
    Re: Cypress Build

    look great, keep up the good work.
    Do not meddle in the affairs of dragons, for you are crunchy and taste
    like chicken...



    My 44" oven in progress...
    __________________________
    http://www.fornobravo.com/forum/f6/s...ally-6361.html

    Comment


    • #3
      Re: Cypress Build

      I got my fire block and will be going with 4" thick for the base. It might be over kill but from what I have read there is no such thing as too much insulation. I have been reading and looks like I will go with the dome on the floor. The extra mass might help keep the heat in. I really am at a fork in the road and do not know witch way to go. It looks like anyone that started cutting all the brick for the dome in the end still has to use a lot of mortar. And it has less to bond to. So the question is do I cut them or not. I have a lot of experience with tile and pool construction and would like to use the hand grinder to cut or shave to fit. Is there any draw back to using a hand grinder? Does it matter as long as I keep the mfg side on the inside of the dome? Sorry to be so long winded but I would like to do it right the first time.
      Thanks for your help.

      Comment


      • #4
        Re: Cypress Build

        Originally posted by Cypress View Post
        I have been reading and looks like I will go with the dome on the floor. The extra mass might help keep the heat in. Is there any draw back to using a hand grinder? Does it matter as long as I keep the mfg side on the inside of the dome?
        Thanks for your help.
        I think you have less mass with the dome on the floor. I put mine on the outside so I have an extra row of brick to get it up to floor level. And I don't quite understand what this means "Does it matter as long as I keep the mfg side on the inside of the dome?". The firebrick is made from the same magic mouse milk on the outside as the inside.
        Good luck with your build.

        Les...
        Check out my pictures here:
        http://www.fornobravo.com/forum/f8/les-build-4207.html

        If at first you don't succeed... Skydiving isn't for you.

        Comment


        • #5
          Re: Cypress Build

          Sorry should have been clear. As long as I keep the uncut sides of the brick facing inward. I will cut them in half’s and then thirds on the wet saw then grind off what I need to have a snug fit. I just need to wait one more day for the concrete to cure.
          90% humidity and 95 degrees to day for the high so long spring…

          Comment


          • #6
            Re: Cypress Build

            Originally posted by Cypress View Post
            Sorry should have been clear. As long as I keep the uncut sides of the brick facing inward.
            I don't think that the matters. I preferred to put the cut side facing in because a lot of my bricks were chipped. That gave me a nice clean surface. I contacted the manufacturer a while back and they confirmed there is no harm exposing the cut surface to the heat.

            Les...
            Check out my pictures here:
            http://www.fornobravo.com/forum/f8/les-build-4207.html

            If at first you don't succeed... Skydiving isn't for you.

            Comment


            • #7
              Re: Cypress Build

              Wow that is something new for me. This opens a lot of doors and ideas. I can now grind the lip out for my door. I am building my new tool tonight. Figured if I cannot buy one from someone on the site I will build. Gives me a reason to go to HF today. Thanks for the help.

              Comment


              • #8
                Re: Cypress Build

                I got side tracked this weekend my wife wanted an inside kitchen makeover so I had to install granite and a tile back splash this weekend. I did get to work some on the oven. I have installed the board and the floor. I am working on cutting the dome and searching for the smoother bricks to replace the rough ones in the floor. I have been looking it over and it looks like I will need to cast my vent. My questions is …. Is there a standard size? I know that the vent will be 8” to the chimney but does size matter on the Vent? It looks like I will have about 12” to cast the vent..
                Thanks for your help


                Comment


                • #9
                  Re: Cypress Build

                  Not sure what you mean. If you are talking area of opening, 8" at chimney pipe, then just make sure your vent opening has more area. You want the vent transition to narrow into the chimney.

                  From my oven experience you want the vent opening as wide as possible, for in the fire starting stage the draw will be lowest and wider makes it easier for the smoke to find its way up.
                  Wade Lively

                  Comment


                  • #10
                    Re: Cypress Build

                    Nice looking base you've poured. It's good you've got steel in it. But Wade is right: the larger the area of the vent opening the better. Since you will have an 8" vent pipe (50 sq in) it's "ideal" to have double the area at the wider end or mouth of the vent opening. Lot's of Builds on this site have done close to that with a 5" or 6" by a 15 or 16" opening between the arches & you're close to the size you want, maybe a little shy of it. HOWEVER, you are casting a vent, so you have a really nice, smooth, elegant transition over a 12" height as you've stated. If you can't make a vent opening double the surface area of the final vent pipe, then at least you can cast a good transition from the widest you can do with your landing space you've created. We all want the smoke to go up the vent so we do what we can during the build but sometimes other factors or constraints dictate you design. You're moving along fast. Keep up the good work, Dino
                    "Life is a banquet and most poor sons-of-bitches are starving to death." -Auntie Mame

                    View My Picasa Web Album UPDATED oct
                    http://picasaweb.google.com/Dino747?feat=directlink


                    My Oven Costs Spreadsheet
                    http://spreadsheets.google.com/ccc?k...BF19875Rnp84Uw


                    My Oven Thread
                    http://www.fornobravo.com/forum/f8/d...arts-5883.html

                    Comment


                    • #11
                      Re: Cypress Build

                      Thanks for the response I took some time to look it over and feel that I can move to 15” wide and 14” deep and a smooth transition to the vent. Odd thing here in a city this dam big (Houston) and I can not find fire clay. I have had all types of products used to insulate in refineries on the other side of town but no fireclay??? I have been on the fence about how the opening to the oven was going to be built. With the cast vent I think that I will go with the angle iron. This leaves me with a rectangle opening and I was thinking for fabricating an arched door out of steel. Is there any benefit to bricking the opening instead of the angle iron?
                      Thanks for your help.
                      Best Regards,
                      Darin

                      Comment


                      • #12
                        Re: Cypress Build

                        I don't think there is much difference between the two, it is mostly appearance. What look are you going for? The arch lends itself to "funneling" the exhaust gas a bit better, but probably not significant.

                        The beauty of casting your vent transition is that it can be any shape you want make it. I went with an expanding arch (outside entry bigger than oven entry) which was not hard to do. I cast my vent in place, so it is perfectly molded to the arch and provides equal weight distribution.

                        I found that pink foam board glued together (5 layer sandwhich with round piece on top) with 3M spray glue worked great as a plug. Easy to shape and when casting was set I just hammered out the middle piece of foam and then the plug came out.
                        Wade Lively

                        Comment


                        • #13
                          Re: Cypress Build

                          Finished my dome this weekend. I will post pic later. I went the way of just a few cuts. My dome is not a perfect dome it is flat at the top. My last two rowes are vertical. They feel solid but want to see if this might be a prob? Thanks for your help

                          Comment


                          • #14
                            Re: Cypress Build

                            Ok here are some pic of the progress

                            Comment


                            • #15
                              Re: Cypress Build

                              Spent the holiday weekend working on my oven. I put some small fires in to start curing process. I have one long crack but I just have a thin coat of motor on it now. I will put another coat on tonight. Should I worry about the crack? I did not see anything on the inside. I was going to just cover it up with the 2nd coat should I be concerned? After the next coat of motor at about ¼ inch then I will put 2 coats of refractory cement each at 1” with SS needles in them to finish the insulation on the dome. I have been working on my stone work till I can get back on the dome…