web analytics
vent and transition progress - Forno Bravo Forum: The Wood-Fired Oven Community

Announcement

Collapse

Photo Galleries are back! Instructions below.

Dear forum users,
Thank you for your patience with the Photo galleries. We've got your galleries online!
We have finished writing a custom script to migrate the PhotoPlog to vBulletin5’s albums.

Unfortunately V-Bulletin killed the "Photoplogs" in their software upgrade which was unforeseen and we're the first development group to have written a script for getting the galleries back... that said, it took some time to reverse engineer the code and get the albums to move over seamlessly!

Forum users will be able to access their “PhotoPlog” images through their user profile page by clicking on the “Media” tab.
They will also be able to browse other albums by going to the albums page. (On the forum site, there is a link in the black bar beside “Forums” to the albums.)

In order for users to create an album please follow the steps below.
1) Go to user profile page and click “Media”
2) Click Add Photos
3) Enter Photo Gallery Title in the first field
4) Click Upload or Select from Photo Album to add photos
5) Click Post
6) Once posted, the album will be created as a “Topic” on the albums page for the public to see. The topic title will be the “Photo Gallery Title” they created before uploading their photos.


To create this migration path we used vBulletin5’s default album structure. Unfortunately, it won’t work like the “PhotoPlog” but is an album/gallery component on the forum now.
See more
See less

vent and transition progress

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • vent and transition progress

    First picture shows yesterdays post of tapering square opening to the round pipe.

    Second and third pictures here show the completion of vent area.

    After all this mortar sets up I will attach the anchor plate to vent with more mortar. This "molditX" mortar I have been using for the brick work is quite handy for this kind of thing. I did use some of the castable product for the keystone on dome but the molditX is also real nice to work with to kind of shape and taper things instead of doing so to the actual bricks. Being kind of lazy to make all the fancy cuts I just floated in some scrape pieces of brick and build things up with mortar. Kind of made fillets on the corners etc to smooth things out.
    Attached Files
    see below for my oven album of progress to date

    http://picasaweb.google.com/wayneber...PizzaOvenWorld

  • #2
    Re: vent and transition progress

    Sorry. I forgot to post my question.
    The anchor plate I bought was from my local fireplace supplier here in Canada. I have no pre drilled holes in the male section of pipe that extends upwards from this anchor plate to fit inside my 6 inch pipe. It is stainless and looks like it has a chrome finish. Super hard to drill into and even the supplied self taping screws are not really making a dint into this stainless pipe. My question is 2 fold.
    I have noticed folks are piling up the mortar, vermic concrete etc right up to the pipe so I am wondering if I really nead to screw it into place if I pile mortar etc all around this area.
    If I do need to drill it out and screw in place any tips on this.....thanks wayne
    see below for my oven album of progress to date

    http://picasaweb.google.com/wayneber...PizzaOvenWorld

    Comment


    • #3
      Re: vent and transition progress

      Sorry, I used the Simpson plate and pipe. They twist lock together - no drilling or screws.
      I would think a good, thick layer of mortar and the vermicrete would hold it, your only using a 3' or 4' pipe - right?

      Comment


      • #4
        Re: vent and transition progress

        Yes RT I will have one 2' and one 1' section of pipe. I will proppably go about 3 or 4 inches up the pipe with my mortar and then a bit of vermiculite and then Type N mortar with small river rock facing it all.
        Should I bother going up the length of the pipe a bit with the vermiculite or would that be a waste of time?....thanks wayne
        see below for my oven album of progress to date

        http://picasaweb.google.com/wayneber...PizzaOvenWorld

        Comment


        • #5
          Re: vent and transition progress

          Originally posted by waynebergman View Post
          <snip>I will probably go about 3 or 4 inches up the pipe with my mortar and then a bit of vermiculite and then Type N mortar with small river rock facing it all.
          Should I bother going up the length of the pipe a bit with the vermiculite or would that be a waste of time?....thanks wayne
          While the additional height of vermiculite and river rock may not be needed, it will look great.

          J W