web analytics
A couple pompei queries - Forno Bravo Forum: The Wood-Fired Oven Community

Announcement

Collapse

Photo Galleries are back! Instructions below.

Dear forum users,
Thank you for your patience with the Photo galleries. We've got your galleries online!
We have finished writing a custom script to migrate the PhotoPlog to vBulletin5’s albums.

Unfortunately V-Bulletin killed the "Photoplogs" in their software upgrade which was unforeseen and we're the first development group to have written a script for getting the galleries back... that said, it took some time to reverse engineer the code and get the albums to move over seamlessly!

Forum users will be able to access their “PhotoPlog” images through their user profile page by clicking on the “Media” tab.
They will also be able to browse other albums by going to the albums page. (On the forum site, there is a link in the black bar beside “Forums” to the albums.)

In order for users to create an album please follow the steps below.
1) Go to user profile page and click “Media”
2) Click Add Photos
3) Enter Photo Gallery Title in the first field
4) Click Upload or Select from Photo Album to add photos
5) Click Post
6) Once posted, the album will be created as a “Topic” on the albums page for the public to see. The topic title will be the “Photo Gallery Title” they created before uploading their photos.


To create this migration path we used vBulletin5’s default album structure. Unfortunately, it won’t work like the “PhotoPlog” but is an album/gallery component on the forum now.
See more
See less

A couple pompei queries

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • A couple pompei queries

    Hello all,
    I am ready to start building the dome today and have tried to self-research, with mixed results, on whether the soldier course needs to be mortared to the floor or not. In some photos it appears as if it has and others not. I seem to remember reading somehwere that they shouldn't be so they could move independent of each other. Then I saw a few pics where it looks like people come back and cover the whole dome in a layer of refrac mortar?

    Also I plan on cutting bevels on the bricks so they fit more snuggly without such a mortar joint and was wondering for the second course on whether people were beveling both sides and top and bottom or just top or bottom? And is there a time period I should wait between course so I don't disturb the course before? Like if I did two courses today should I wait for a couple days for that mortar to really set up before I work on the next few? I guess I should say that I plan on making my own mortar with fireclay, lime, cement and sand. If I make the mortar correctly and soak the bricks for an hour prior do I need to wet the mortar anymore while it cures?

    I am doing a 42" oven as a hybrid between low and high vaultm and I just guessed the oven height opening and opening height from the 36" high dome in the FB plans would be about what I needed.
    Dome height 18"
    Opening 19"
    Opening height 12"
    Any suggestions. I don't need a ton of room to get big roasts in and I like the idea of keeping heat.

    Thanks again for the help, I plan on posting a thorough thread when I get near the end but with an 8 week old my work on the oven is sporadic at best.

    darren
    Attached Files
    antibacterial soap...just say no!

  • #2
    Re: A couple pompei queries

    Hi Darren,
    I have recently completed my Pompeii and have tried to explain it's construction and details with photos commencing at:

    http://www.fornobravo.com/forum/f8/n...-1-a-2005.html

    then continued with the build where the oics were supposed to be at:

    http://www.fornobravo.com/forum/f21/...-4-a-2045.html

    and then again at:

    http://www.fornobravo.com/forum/f21/...10-a-2119.html

    because one of my postings was moved.
    I tapered and mortared my soldier course onto the vermiculite base and did 3 or 4 courses with the initial mix of mortar. I would do the same over again when I build my son in law's Pompeii later in the year so go for it!
    Hope this helps. email me if you have any other specific queries.

    Regards, happy building and good luck


    Neill
    Prevention is better than cure, - do it right the first time!

    The more I learn, the more I realise how little I know


    Neill’s Pompeiii #1
    http://www.fornobravo.com/forum/f8/n...-1-a-2005.html
    Neill’s kitchen underway
    http://www.fornobravo.com/forum/f35/...rway-4591.html

    Comment


    • #3
      Re: A couple pompei queries

      Originally posted by rwiggim View Post
      ... I plan on cutting bevels on the bricks so they fit more snuggly without such a mortar joint and was wondering for the second course on whether people were beveling both sides and top and bottom or just top or bottom?
      Darren,

      For my 43” Pompeii, I elected to get tapered bricks, as they were basically the same price as standard firebricks. I initially planned to just cut them in half and so end up with deep radial vees on the outside of the dome. But my brickie persuaded me to taper the sides of each brick to minimise these joints. The refractory mortar I’m using has a thickness limit of 2mm max, so it means good brick-to-brick joints are essential. I was a little concerned at how long this might take, even with a wet diamond saw, but I’ve managed to set up a rig on the saw table, which is better explained in the pics in my post at http://www.fornobravo.com/forum/28/t...html#post12106.

      The first “floor ring” using 30 standard half bricks took around 60 minutes for the lot! However, subsequent rings can not be simply flipped upside down, as there is a top and bottom orientation as the bricks increase in angle. I’m still messing around with ways of lifting the bricks the required amount for the higher courses, but as far as cutting goes, it really doesn’t take long when all is set up accurately. I like a challenge!

      See photo’s below for an idea of the results for the second and third rings. While I’m happy with the results so far, I’ll let you know how I fare on the upper courses. If all else fails, I’ve got a bag of alternative refractory mortar which is OK for greater thicknesses.

      Originally posted by rwiggim View Post
      And is there a time period I should wait between course so I don't disturb the course before? Like if I did two courses today should I wait for a couple days for that mortar to really set up before I work on the next few? I guess I should say that I plan on making my own mortar with fireclay, lime, cement and sand. If I make the mortar correctly and soak the bricks for an hour prior do I need to wet the mortar anymore while it cures?
      While my mortar sets up really fast, NissanNeill would be better placed to comment on this, as I think he used a similar mortar to what you’re proposing. He also has some practical advice at http://www.fornobravo.com/forum/f2/m...html#post13233 regarding tapers.

      Originally posted by rwiggim View Post
      I am doing a 42" oven as a hybrid between low and high vaultm and I just guessed the oven height opening and opening height from the 36" high dome in the FB plans would be about what I needed.
      Dome height 18"
      Opening 19"
      Opening height 12"
      Any suggestions. I don't need a ton of room to get big roasts in and I like the idea of keeping heat.
      Your opening has similar dimensions to mine, which will be a high vault (21½ ”). My only concern now is that a slightly wider opening (mine is only 18”) would have made manipulating things around in the oven easier, especially as my vent will be the same width and protrude about 12”. But like you, I like the idea of keeping the heat in.

      Hope this helps,
      Paul.
      Attached Files
      Last edited by Hendo; 08-01-2007, 07:37 PM.

      Comment


      • #4
        Re: A couple pompei queries

        Thanks for the input.
        darren
        antibacterial soap...just say no!

        Comment

        Working...