web analytics
Insulating slab question - Forno Bravo Forum: The Wood-Fired Oven Community

Announcement

Collapse

I'm Peter Reinhart! Ask Me Anything! Monday, February 15, 2016 7:00-8:00 pm EST

To kick off our AMA feature, we have invited author, chef and master bread maker and host of Pizza Quest, Peter Reinhart, to be our first host! Peter will be in the Forum on Monday, February 15th, from 7:00 - 8:00 pm EST. If you are unable to be online during the live session, you can post your questions in the sticky post. Peter will answer those questions during the live session on February 15th. You can view Peter's answers to your questions as well as what happened during the live session in the session thread.

Ask Me Anything New Forum Feature

You will notice a new forum at the top of the main page called, "Ask Me Anything". This forum will be used for live one hour "Ask Me Anything" (AMA) sessions hosted by people who are knowledgeable in different areas pertaining to wood fired ovens. How it works:
- Each AMA will have a "sticky" thread where the community can post questions they would like answered during the live session. This will allow everyone to participate even if you can't be online for the live session. These questions will not be answered by the host until the live AMA; if you need an answer quickly, you should post it in the appropriate Forum area for the community to respond.
- Another thread will be posted for the live AMA. Registered users who are logged in during the live session can interact with the host by asking questions and receiving responses.
- The live thread will remain in the AMA forum to view after the session.

We hope you enjoy this new feature! Please let us know if there is a topic that you'd like to have as an AMA and we'll look for a host!

Forno Bravo
See more
See less

Insulating slab question

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • Insulating slab question

    I finished my structural layer and poured my insulating layer using about 4 parts vermiculite and perlite to 1 part portland cement... no other aggregates. It is only a day since the pour, but it seems like I could easily a knife through it. In other words it more resembles hard sand, than cement. Is that normal? What should this layer feel like?

    Thanks in advance.

  • #2
    Re: Insulating slab question

    Originally posted by cholme View Post
    I finished my structural layer and poured my insulating layer using about 4 parts vermiculite and perlite to 1 part portland cement... no other aggregates. It is only a day since the pour, but it seems like I could easily a knife through it. In other words it more resembles hard sand, than cement. Is that normal? What should this layer feel like?

    Thanks in advance.
    Your description and concern are common threads here.

    The vermicrete will support a lot of weight, despite its crumbliness. Give it a couple more days and you should be ready to start
    Lee B.
    DFW area, Texas, USA

    If you are thinking about building a brick oven, my advice is Here.
    Our One Meter Pompeii Oven album is here.
    An album showing our Thermal Breaks is Here.

    I try to learn from my mistakes, and from yours when you give me a heads up.

    Comment


    • #3
      Re: Insulating slab question

      You can increase the strength of the insulating slab by adding sand to the mix, but you also reduce the insulating value. The 5:1 mix has been proved to have adequate strength, so it's best to stick to the plan.
      Kindled with zeal and fired with passion.

      Comment


      • #4
        Re: Insulating slab question

        LeeB pretty much covers it. It will have very good compression strength, but always (even when fully cured) remain crumbly. Give it a full week to cure if you still have an uneasy feeling, it will be hard then (but still crumbly).
        Don't let the rain get to it, you wil have a runny oatmeal mess if you do...its far from weatherproof and absorbs water better than a sponge.

        RT

        Comment


        • #5
          Re: Insulating slab question

          As for any portland based material, after the initial set (10-12 hrs), keep it wet for at least 7 days. If you inadvertently allowed it to dry out, you may have to rip it out and re-pour.
          Last edited by Neil2; 06-19-2011, 03:10 PM.

          Comment


          • #6
            Re: Insulating slab question

            Mine was "crumbly" for days. But I kept it covered, and voila! a week later, it had the consistency of styrofoam. Yes, I could dig at it if I wanted, but it was pretty solid.

            Just layered some on top of my dome. Perfect curing conditions - the oven is under a canopy, but it's going to be raining for the next few days (100% humidity).

            Comment