web analytics
Foundation question - Forno Bravo Forum: The Wood-Fired Oven Community

Announcement

Collapse

Photo Galleries are back! Instructions below.

Dear forum users,
Thank you for your patience with the Photo galleries. We've got your galleries online!
We have finished writing a custom script to migrate the PhotoPlog to vBulletin5’s albums.

Unfortunately V-Bulletin killed the "Photoplogs" in their software upgrade which was unforeseen and we're the first development group to have written a script for getting the galleries back... that said, it took some time to reverse engineer the code and get the albums to move over seamlessly!

Forum users will be able to access their “PhotoPlog” images through their user profile page by clicking on the “Media” tab.
They will also be able to browse other albums by going to the albums page. (On the forum site, there is a link in the black bar beside “Forums” to the albums.)

In order for users to create an album please follow the steps below.
1) Go to user profile page and click “Media”
2) Click Add Photos
3) Enter Photo Gallery Title in the first field
4) Click Upload or Select from Photo Album to add photos
5) Click Post
6) Once posted, the album will be created as a “Topic” on the albums page for the public to see. The topic title will be the “Photo Gallery Title” they created before uploading their photos.


To create this migration path we used vBulletin5’s default album structure. Unfortunately, it won’t work like the “PhotoPlog” but is an album/gallery component on the forum now.
See more
See less

Foundation question

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • Foundation question

    I'm getting ready to begin installing a Casa110 on my backyard patio. The patio is made of large slabs of stone and the edges are done in brick. I'm planning to orient the oven over one of the corners of the patio so the front half of the oven will be over the patio and the back half will be over the yard.

    My question is, do I need to remove the part of the patio on which the oven will sit and pour a slab for the whole structure or can I just add a slab extending out into the yard for the back half of the structure?

    Clearly it would be easier to do the latter but the concern is the new slab may separate from the patio and/or the patio structure will not be strong enough for the weight of the oven. Any thoughts would be most appreciated!

  • #2
    Re: Foundation question

    Jbuild,
    IMHO having a foundation bisected with such a distinct line of support is simply asking for problems. If it were mine I would cut out the area of the patio stones and then work to get the subsoil there and the area outside the patio the same compaction, then pour a base and start my build.

    Hope this helps,
    Wiley

    Comment


    • #3
      Re: Foundation question

      What he said, for certain.

      Comment


      • #4
        Re: Foundation question

        I agree. Pour a slab that is separated from your patio. Always expect some settlement, even on well compacted subbase. If the slab is separate, the settlement won't even be noticed. If it is attached or overlapping, there will be cracks.

        Comment


        • #5
          Re: Foundation question

          Thanks. I appreciate your input.

          Comment


          • #6
            Re: Foundation question

            It's way too much work to do half right.
            Joe

            Member WFOAMBA Wood Fired Oven Amatueur Masons Builders America

            My thread: http://www.fornobravo.com/forum/f8/j...oven-8181.html

            Comment


            • #7
              Re: Foundation question

              Hi jbuildarkansas

              The patio is made of large slabs of stone and the edges are done in brick. I'm planning to orient the oven over one of the corners of the patio so the front half of the oven will be over the patio and the back half will be over the yard.
              I would get a diamond saw blade, cut through the stone paving across the front of your proposed oven foundation and then (obviously depending on the thickness of your cement and stone paving) dig my footings to have a reinforced beam foundation and drill into the side of the stone and brick and drive some reinforcing steel rod to tie your new footings to your existing paving. If your paving is fairly thin, then I would dig say 6 to 8 " under your cut edge and make sure that the poured concrete is pushed right in and under to ensure that they not only bond but support your paving. You will also need to wash with water the underside of your paving.

              Neill
              Prevention is better than cure, - do it right the first time!

              The more I learn, the more I realise how little I know


              Neill’s Pompeiii #1
              http://www.fornobravo.com/forum/f8/n...-1-a-2005.html
              Neill’s kitchen underway
              http://www.fornobravo.com/forum/f35/...rway-4591.html

              Comment

              Working...
              X