web analytics
Stamford, CT 42" Pompeii - Forno Bravo Forum: The Wood-Fired Oven Community

Announcement

Collapse

I'm Peter Reinhart! Ask Me Anything! Monday, February 15, 2016 7:00-8:00 pm EST

To kick off our AMA feature, we have invited author, chef and master bread maker and host of Pizza Quest, Peter Reinhart, to be our first host! Peter will be in the Forum on Monday, February 15th, from 7:00 - 8:00 pm EST. If you are unable to be online during the live session, you can post your questions in the sticky post. Peter will answer those questions during the live session on February 15th. You can view Peter's answers to your questions as well as what happened during the live session in the session thread.

Ask Me Anything New Forum Feature

You will notice a new forum at the top of the main page called, "Ask Me Anything". This forum will be used for live one hour "Ask Me Anything" (AMA) sessions hosted by people who are knowledgeable in different areas pertaining to wood fired ovens. How it works:
- Each AMA will have a "sticky" thread where the community can post questions they would like answered during the live session. This will allow everyone to participate even if you can't be online for the live session. These questions will not be answered by the host until the live AMA; if you need an answer quickly, you should post it in the appropriate Forum area for the community to respond.
- Another thread will be posted for the live AMA. Registered users who are logged in during the live session can interact with the host by asking questions and receiving responses.
- The live thread will remain in the AMA forum to view after the session.

We hope you enjoy this new feature! Please let us know if there is a topic that you'd like to have as an AMA and we'll look for a host!

Forno Bravo
See more
See less

Stamford, CT 42" Pompeii

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • Stamford, CT 42" Pompeii

    I am going to break ground on my oven sometime this weekend; before I do, I have several questions to ask to help me determine my final plan.

    -First how many of you mortared each cinder block vs. the pouring the cement in every other hole? If you could do it over, would you do it differntly, and how so?

    -What is the best way to determine what size shim to use?

    -If you could change one thing about your oven, what would it be?


    Once the the oven is underway I hope to update this thread with pictures to track the progress of my low-dome Pompeii oven.

  • #2
    Re: Stamford, CT 42" Pompeii

    I dug down 40 inches and built on a footing, I mortared each layer and filled some of the cores, takes a little longer but once I got the hang of it, it went fast

    Comment


    • #3
      Re: Stamford, CT 42" Pompeii

      -First how many of you mortared each cinder block vs. the pouring the cement in every other hole? If you could do it over, would you do it differntly, and how so?
      I made a base partly of mortared cinder block, and partly of regular brick. Because my structure was going to be two stories tall, dry stacking was never an option. If I had to do it again, I would have sprung for brick throughout. Cinder block isn't THAT much cheaper than scrounged/on sale brick, and once you've laid it you're done: no stucco, tile, or other finishing after the fact.
      -If you could change one thing about your oven, what would it be?
      I'd have designed a stone counter work area, with a hand washing sink right next to the oven. Your hands get really grubby making pizza, and a sink is near indispensable.
      My geodesic oven project: part 1, part 2

      Comment


      • #4
        Re: Stamford, CT 42" Pompeii

        -What is the best way to determine what size shim to use?
        CAD. The attatched sketch shows the brick tilt for a 42 hemispherical oven to use a .467 shim
        Attached Files
        My geodesic oven project: part 1, part 2

        Comment


        • #5
          Re: Stamford, CT 42" Pompeii

          I decided I am going to mortar each block in the foundation. I also decided the height of my dome is going to be 14.5 inches.

          Comment


          • #6
            Re: Stamford, CT 42" Pompeii

            I dry stacked the blocks then filled the cores with concrete. Fast and easy - Even I could do it.

            -If you could change one thing about your oven, what would it be?
            I would use FB Board under my oven. I wouldn't sweat over the price or the shipping cost, I would just order it and be done. You only get one shot at doing the subfloor insulation - do it RIGHT.
            Ken H. - Kentucky
            42" Pompeii

            Pompeii Oven Construction Video Updated!

            Oven Thread ... Enclosure Thread
            Cost Spreadsheet ... Picasa Web Album

            Comment


            • #7
              Re: Stamford, CT 42" Pompeii

              I am starting my form tomorrow, so I was wondering if anyone had any pointers on that.

              Comment


              • #8
                Re: Stamford, CT 42" Pompeii

                Less is more, is the usual "form" advice. Any sort of solid form prevents you from cleaning up your mortar on the inside bricks as you go, and once you dig out your form, it's too late to remove the now-solid mortar.

                The main point is that no form is needed until the bricks start to curve inward, and they are self supporting even then once the chain is underway.

                Do a forum search for "indispensable tool" for a good idea.
                My geodesic oven project: part 1, part 2

                Comment


                • #9
                  Re: Stamford, CT 42" Pompeii

                  I finished my dome a week ago and put the chimney on the entry arch last night. I did not use a form at all on the dome. I kept expecting to need something to keep the bricks from sliding off, but as I gained experience with the mortar (Heatstop 50), I learned how wet to mix it to make it sticky enough and then just held the bricks in place until the mortar set enough for the brick not to slide. Even the last couple of courses didn't slide because I was using 1/3 and 1/4 bricks by then. That surprised me. But I would have liked the indispensable tool if for no other reason than to make the oven more round. As I looked at my chimney it leans just a bit (about a quarter inch over 3 feet). I'm convinced that nothing on my build is straight, square, level, plumb or round. Fortunately, almost everything I've done so far will be covered up (no doubt by something else that is not square, plumb nor level). I suspect the pizza won't mind. They're not likely to be round either.

                  Joe
                  Joe

                  Member WFOAMBA Wood Fired Oven Amatueur Masons Builders America

                  My thread: http://www.fornobravo.com/forum/f8/j...oven-8181.html

                  Comment


                  • #10
                    Re: Stamford, CT 42" Pompeii

                    So I didn't get very far on my oven last fall before winter hit(dug a little, but never got the foundation poured). I am looking to get back at it and have revised my plan a bit. I am going with 45" oven, and am going for an authentic Neapolitan oven. Hopefully the height is going to be around 13.4". In terms of the mouth, I'm going for about 8.5" in height and about 15"-16" wide. What I would like to do is purchase the FB floor board since I have heard such good reviews . Hopefully I can get the foundation and stand done in the next week or two so I can get going on the dome.

                    Comment


                    • #11
                      Re: Stamford, CT 42" Pompeii

                      For what height dome is the .467 shim used for? THanks, MT