Hello, Forno Bravo Community Forum Members!

The Forno Bravo team has heard the feedback in regards to the community forum. We wanted to take the time to re-enforce our commitment to a fully engaged Forum with professional moderation.

Our top priority as a company is to fix all forum errors and issues that you are experiencing. As we are swiftly working on these problems, we want to say that we highly value the Forum Bravo Community Forum and every single community forum member.

We have set up this thread so that every member can address any concerns, issues and questions about the forum. Please feel free to ask whatever you would like in regards to the forum; let us know what issues you are experiencing so we can work on resolving them as fast as possible. However, we stress that we would like constructive engagement, so please be specific about the issue you are experiencing.

Thank you for all of your patience and continued support.

Link to topic: http://www.fornobravo.com/community/...with-new-forum
See more
See less

Foundation Drying question

  • Filter
  • Time
  • Show
Clear All
new posts

  • Foundation Drying question

    I poured a 6" Foundation slab and I'm wondering how long I should wait to take off the forms and how long before I can start stacking my cement block for the stand?

    It's been a couple days and seems pretty firm but I worry I'll put too much on too quickly and strain anything still too wet lower down.

    Shay - Centerville, MN

    My Outdoor Kitchen/Pompeii WFO Build...

  • #2
    Re: Foundation Drying question

    Concrete cures by a chemical reaction not by drying. Drying however, can retard the curing and lower the ultimate strength of the concrete. Concrete likes/needs to be kept wet/damp for several days after being poured. When I poured the slab for my house I nailed thin strips on top of the forms and "ponded" the whole slab (28x40ft) for a week which was way overkill, but it was summer and hot. On my slab/foundation for the WFO I covered the surface with old towels and wet them down with a hose several times a day for the first few days.

    Concrete will continue to cure and get stonger for decades, however, for all practical purposes concrete will have over 90 % of it's final strength in 28 days. It's not uncommon to pull the forms in three days and have the concrete strong enough to have workmen start to install sill plates within a week. The surface will be somewhat delicate and should you have a fancy ultra smooth finish you want to be careful as it can be fairly easily damaged for the first week.
    Hope this is some help,


    • #3
      Re: Foundation Drying question

      Kinda. You guys and your specifics. I have been keeping it wet but I do not have a ultra smooth finish because I didn't care that much for this part. I'll keep wetting it down and probably start stacking this evening. I poured Saturday morning so that's almost 3 days.
      Shay - Centerville, MN

      My Outdoor Kitchen/Pompeii WFO Build...


      • #4
        Re: Foundation Drying question

        Keep it damp for at least 6 days. Longer if possible.

        Concrete generally reaches 50% of its ultimate strength after 6 days and as Whiley notes, 90% after 28 days. (but only if it has moisture available continually for the entire period.)

        You should be OK to start build the block walls after 3 days of curing.
        Last edited by Neil2; 06-22-2009, 04:37 PM.


        • #5
          Re: Foundation Drying question

          I poured my 6-8" foundation on saturday evening and pulled the forms today which is 2 full days. I'll let you know if iI have any surprises.

          See My Photos:http://picasaweb.google.com/tonyboca5/IlForno#

          My thread:


          • #6
            Re: Foundation Drying question

            I laid the first course of blocks while the slab was still wet (3-4 hours after the pour), and built the rest of the stand the next morning. Also, it is probably best to brush the slab to make it rough. You don't really want the slab too smooth, otherwise you won't get good bonding of the stand to the slab. If you are worried about that, they sell concrete bonding agent at home depot which should do the trick.

            Your mix was probably 3000 or 4000 psi, so I wouldn't worry... Just keep off the edges.