To kick off our AMA feature, we have invited author, chef and master bread maker and host of Pizza Quest, Peter Reinhart, to be our first host! Peter will be in the Forum on Monday, February 15th, from 7:00 - 8:00 pm EST. If you are unable to be online during the live session, you can post your questions in the sticky post. Peter will answer those questions during the live session on February 15th. You can view Peter's answers to your questions as well as what happened during the live session in the session thread.

Ask Me Anything New Forum Feature

You will notice a new forum at the top of the main page called, "Ask Me Anything". This forum will be used for live one hour "Ask Me Anything" (AMA) sessions hosted by people who are knowledgeable in different areas pertaining to wood fired ovens. How it works:
- Each AMA will have a "sticky" thread where the community can post questions they would like answered during the live session. This will allow everyone to participate even if you can't be online for the live session. These questions will not be answered by the host until the live AMA; if you need an answer quickly, you should post it in the appropriate Forum area for the community to respond.
- Another thread will be posted for the live AMA. Registered users who are logged in during the live session can interact with the host by asking questions and receiving responses.
- The live thread will remain in the AMA forum to view after the session.

We hope you enjoy this new feature! Please let us know if there is a topic that you'd like to have as an AMA and we'll look for a host!

Forno Bravo
See more
See less

Dry stacking the dome, then mortar

Collapse
X
  • Filter
  • Time
  • Show
Clear All
new posts

  • Dry stacking the dome, then mortar

    Howdy folks,

    A friend of mine (a much better mason than I) who built an oven several years ago told me that, when he built his oven using half cut bricks, he dry stacked most of the dome using an inner form and shims on the outer gaps and then mortared the bricks afterwords. He then pulled the shims, did a bit of touch-up and was done. Only on the top couple of courses (that had custom cuts) did he mortar "as he went".

    My plan was to mortar each course as I went. All my brick experience is with constant thickness gaps where this is the only way I know. But with a large outer gap for the half-cut bricks, this is another alternative.

    His comment was that he felt that he could keep the inside of the dome a lot cleaner (less mortar squeezing through) and since he was using a form (and couldn't clean as easily as he went) this was important.

    I would appreciate any and all feedback.

    Good Roads

    Harpist
    The pizza oven project can be seen in detail here!

  • #2
    Re: Dry stacking the dome, then mortar

    I do not think you will have a problem doing that, but remember that the role of mortar is holding bricks apart, not holding them together. That is to say, there is a tolerance in the actual dimensions of brick, and stacked dry your courses may wander a bit.

    Comment


    • #3
      Re: Dry stacking the dome, then mortar

      Originally posted by Tscarborough View Post
      I do not think you will have a problem doing that, but remember that the role of mortar is holding bricks apart, not holding them together. That is to say, there is a tolerance in the actual dimensions of brick, and stacked dry your courses may wander a bit.
      Tscarborough,

      When using a form I would have thought that the form itself would have the largest effect on whether the courses "wander". But as the gaps in dry stacked bricks are "chinked", it is probably pretty easy for the bottom edges to slip a little too causing vertical deviations in the course.

      I hadn't thought about the role of gap in keeping expanding bricks from pushing together. Should direct brick-brick contact be minimized (i.e. always have a small layer of mortar)? If this were the case, the dry stack method would not be advisable.

      Good Roads

      Harpist
      The pizza oven project can be seen in detail here!

      Comment


      • #4
        Re: Dry stacking the dome, then mortar

        As a rule in masonry design, the mortar has to be softer than the masonry units, and the joint is sized to allow for both the variation of size in the units (minimal for firebrick) and also for the expected expansion and contraction of the system through it's expected thermal cycle (also minimal for firebrick) and long term expansion of clay masonry/shrinkage of concrete masonry). This allows for any movement to take place in the joints and not in the units themselves. Most mortars have a property called called autogenous healing, especially lime based mortars. This means that they will self-heal minor cracking and settling, while brick/CMU alone can not.

        What all of this means for a brick oven is that it doesn't really matter, if the FB plans are followed, they are sufficiently over engineered that you will be fine doing it dry laid. Just be sure and make sure the joints are as close to 100% filled as is practical.

        I would say, however, that a modicum of care when wet laying the brick will take care of most of the mortar on the face, even when laying against falsework, and it will be faster and easier.

        Comment


        • #5
          Re: Dry stacking the dome, then mortar

          Why a chimney for your grill? Does it draw smoke when cooking meat?? Seems smoke would go straight up. Interesting. Very good looking set up. Congratulations...